Utility Billing
Did Your Arkansas Solar Quote Assume the Old Net-Metering Rules?
A solar quote can use the familiar phrase net metering while assuming billing treatment that does not match your account. Arkansas's legacy classifications and utility tariffs make the underlying records essential.

If your Arkansas solar proposal promised that exported electricity would offset utility purchases one for one, check which billing arrangement the estimate assumed. The words net metering alone do not answer that question. Arkansas distinguishes legacy, legacy-transitional, and non-legacy customers, and the classification can materially change a household's billing calculation.
The useful starting point is the utility's record for the particular facility. A sales-contract date, installation photograph, or salesperson's promise is not a replacement for that record. Gather the interconnection submission, the applicable tariff, and a recent bill before deciding whether the difference is a billing error, an outdated estimate, or something else.
Understand the three labels
The current Arkansas rules define legacy customers by submission of the Standard Interconnection Agreement before March 13, 2023. Legacy-transitional customers submitted on or after that date but qualified for the protected prior structure. Non-legacy customers did not qualify for that protection.
Ask the utility to state the classification in writing and identify the facility to which it applies. That is especially useful if you have more than one array, changed owners, or expanded an existing installation. Keep the response with the account number and project identifier so it can be matched to the correct bill.
The qualifying record matters more than the sales date
Section 457-206 preserves qualifying treatment until June 1, 2040. It specifies actions before September 30, 2024: an interconnection-agreement submission, a qualifying facilities-agreement submission with estimated make-ready costs paid, or a qualifying commission complaint over a disputed facilities agreement and costs. Utility signature and approval were not required to establish the eligibility date.
Do not reduce those different routes to “I signed for solar before the deadline.” A private purchase agreement is not the utility's Standard Interconnection Agreement. Request the submitted document and a timestamp or receipt showing when it reached the relevant recipient. If a deadline-day submission or disputed qualification is involved, get an account-specific explanation rather than relying on a general webpage.
How the billing can differ
The statewide billing rule distinguishes protected kilowatt-hour netting from the alternative structure elected by the utility for non-legacy customers. It does not establish one universal statewide dollar export price.
Entergy Arkansas provides a concrete example. Its Legacy Schedule 52 covers both legacy and legacy-transitional customers. Its Non-Legacy Schedule 71 separately measures utility deliveries and exports, applies the specified retail charges to deliveries, and values exports at avoided cost as a dollar credit, with exclusions for certain charges. Schedule 71 also provides for annual avoided-cost redetermination.
That Entergy example is not a statement that every cooperative, municipal system, or other Arkansas provider has the same tariff. Identify the actual provider and schedule. Do not import another utility's export figure into your own savings calculation.
A production screenshot cannot explain the entire bill
Imagine two estimates based on the same household and solar-production assumptions. One values exported energy as an offset to purchased kWh; the other values exports separately. Even if both predict the same physical production, they can predict different household costs. This is a comparison of accounting methods, not a current rate calculation.
Ask the seller to label each input: consumption, solar production, onsite use, grid purchases, exports, and the price or credit assigned to each. Then add the solar payment and the utility charges that remain. A single annual savings percentage hides too much to resolve a specific disputed bill.
Match the bill's meter-reading dates before comparing it with an app's calendar-month totals. Ask for an explanation of each line that does not reconcile. Keep performance questions separate from compensation questions so an explanation about sunny weather does not substitute for an explanation of the tariff.

Expansions and home sales need their own review
The legacy rule protects previously qualified capacity when non-legacy capacity is added to a legacy-transitional facility. It also attaches the protected period to the facility at the premises rather than the customer, while prohibiting carrying that protection to a different location.
An expansion proposal should therefore identify each portion and its treatment. A home-sale file should include the utility agreements as well as the solar financing or lease documents. Those are separate relationships; resolving one does not automatically resolve the other.
What to gather when the estimate looks outdated
Preserve the original quote, every savings worksheet, dated interconnection records, utility correspondence, recent bills, and any expansion paperwork. Ask the seller which classification and tariff were used and whether the calculation has been revised since the agreement was signed. Retain the original and revised versions separately.
Use Arkansas utility-billing guidance and the document-review checklist to organize the issue. If the resulting household obligation is difficult to manage, include the payment and financing records. You can request a Solar Exit agreement review without assuming the bill establishes a right to cancel.
General consumer information, not legal, financial, tax, or electrical advice. Exit Your Solar is not a law firm. Qualification, billing, and possible remedies depend on the facility, documents, dates, utility, current tariff, and individual facts. No outcome is guaranteed.
Sources Reviewed
- Arkansas net-metering rules: DefinitionsReviewed October 15, 2026Current official codification reverified. Preserve utility-specific scope and exact before-September-30 qualification language.
- Arkansas net-metering rules: Billing for net-meteringReviewed October 15, 2026Current official codification reverified. Preserve utility-specific scope and exact before-September-30 qualification language.
- Arkansas net-metering rules: Legacy status for net-metering facilitiesReviewed October 15, 2026Current official codification reverified. Preserve utility-specific scope and exact before-September-30 qualification language.
- Entergy Arkansas Schedule 52Reviewed October 15, 2026Definition and billing structure reverified. Billing sheets effective December 31, 2023; Schedule 71 annual-review sheet effective March 1, 2024. Current avoided-cost attachment effective March 2, 2026. No dollar export credit asserted.
- Entergy Arkansas Schedule 71Reviewed October 15, 2026Definition and billing structure reverified. Billing sheets effective December 31, 2023; Schedule 71 annual-review sheet effective March 1, 2024. Current avoided-cost attachment effective March 2, 2026. No dollar export credit asserted.